The installation and commissioning cycle of LED displays for meeting rooms is usually 3-7 days, and the specific duration needs to be comprehensively evaluated according to screen size, installation environment and functional requirements.
1. Main Factors Affecting the Construction Period
• Screen size and complexity:
◦ Small size (e.g., 2×3 meters) can be completed in 1-2 days.
◦ Large size or special-shaped screens (e.g., curved, foldable screens) require an additional 1-2 days for commissioning.
• Installation environment preparation:
◦ Basic works such as wall load-bearing transformation and line pre-embedding need to be completed in advance, otherwise the construction period will be extended by 1-3 days.
◦ Aerial work (e.g., hoisting) may increase safety protection time.
2. Phased Time Reference
• Hardware installation:
◦ Bracket fixing and module splicing take about 1-2 days.
◦ Power and signal line wiring takes 0.5-1 day.
• Software commissioning:
◦ Basic display calibration (brightness, color balance) takes about 0.5 days.
◦ Advanced functions such as multi-screen synchronization and signal switching take 1-2 days.
3. Suggestions to Shorten the Cycle
1. Confirm the design scheme in advance to avoid on-site modifications.
2. Select standardized modules to reduce customized commissioning.
3. Coordinate with suppliers of peripheral equipment such as network and audio to enter the site synchronously.
Note: If special requirements are involved (e.g., 4K high refresh rate, remote control), an additional 1-2 days of testing may be required.